well that onyl took 3 1/2 months. anyways, sorry i didn't update i wil lpost the rest of the pics i got, not a whole lot. all in all it is done. Alex and I finished everything up on thrusday night, and we bled the brakes and put on the wheels last night and jump started it (Dead battery
) runs great, the brakes need some more bleeding and i have to install the rear swaybar when the new endlink arrives. i broke one of them, which was really stsupid.
so glad Alex could come help because i would have gone nuts without him there, this things suspession is a joke, it is quite rediculous and i hate it. but it is all together. i can now hear the strut tops really well, so thats next on the list. it needs a major allignment and a tire rotation before beatin it up on the tracks in medford OR. in 2 weeks.
so yeah this was a dumb project but i learned alot of things, and got alot of experience with the welding and stuff.
funny thing is i have sound dampening material scattered all over it with no back seats or anything. and the gas tank access panels still out so i hear the fuel pump whine, along with the massive rush of air and noise shooting up from those big holes. i will reassemble the interior at my leisure. Yay for not having to ride the motorcycle in the rain and snow anymore!!